Concrete Remedial Group

Returning Longevity to Concrete Structures
0412033957

Caulking and Epoxy mortar repair

Before

« Back to Album Photo 1 of 5 Previous | Next
Before
Recent job completed involved removing old joint sealant and replacing with Dowel corning 888 sealant. Epoxy repair was done with Nitomorta 903 as the old repair had failed.
Posted on 28 January 2020